Wednesday, 7 November 2012

Post 7 - Additional Pre-Production Information

Above are the technical and location recce for our group, we had to take pictures of our settings for the location recce and we had to consider some major points in the technical recce before filming, such as the lighting situation (we did not need any lights on due to the fact that we would be filming in daylight), we also had to consider whether the temporary classroom we intended to shoot in would be available to film in at our time of asking, the good thing for us was that we gave plenty of notice to the rooms main owner and so we were able to film as scheduled. We too had to consider the weather for the day of filming, we checked several weather forecasts before shooting and we made sure that there would be no cause for concern due to bad weather on the potential day of filming. I made the location and technical recce whilst the other group members performed various other pre-production roles.

Above is the Mise-en-scene description for our group, for this we had to consider the five main components of mise-en-scene before filming, just to see what components we had to consider. Ben made the mise-en-scene description for the group.

Above is the prop list and group roles, pretty much self explanatory it shows the props needed to film and what roles we all took up within the group. I made the prop list and group role document. 



Above is the shooting schedule, made by Danny and Charlie.

No comments:

Post a Comment